How to Enter Job Details, Additional Info, Description and Notes
Description
Use the Job Details, Additional Info, Description and Notes sections to define the job’s identity, financial structure, retention rules, compliance settings, and narrative context. Accurate setup ensures correct behaviour across purchasing, scheduling, timesheets, invoicing, WIP reporting, and subcontractor claims.
Step-by-step instructions
1. Add a new Job
Click the + Add button. This will open the Add Job screen.
Job related details and settings are grouped into sections at the top of the Add Job screen which are described in the following sections:
When you have finished entering job details, return to the Basic Details tab and click Save to confirm the new job entry.
2. Edit an existing Job
After a job is saved, details can be edited at any time by selecting the job from the Job Setup list, then clciking the Edit Button
3. Enter Basic Job Details
Use the Basic Details section to define the core identity and behaviour of the job.
🔴 Note: Any field marked with a red (!) icon is mandatory. |
4. Enter Additional Job Details
Use the Additional Details tab to define extended job data.
Job Dates
| Field | Description | Example / Notes |
|---|---|---|
| Start Date | Enter the proposed or actual start date. | — |
| Estimated Completion Date | Enter the expected finish date. | — |
| Estimated Days | Enter estimated duration in days. | — |
| Date Completed | Enter the actual completion date once the job is finished. | Important for WIP reporting |
| Contract Received | Enter the date the signed contract was received. | — |
Customer & Contract Fields
| Field | Description | Example / Notes |
|---|---|---|
| Customer PO Number | Enter the customer’s purchase order reference. | — |
| Customer Tax Status | Enter the customer’s tax status. | — |
Retention Settings
Retention determines how much money is withheld and when it is released.
| Field | Description | Example / Notes |
|---|---|---|
| Retention Percent 1 | Percentage for the first retention band | Example: 10% |
| Retention Band 1 | Dollar value limit for band 1 | Example: $200,000 |
| Retention Percent 2 | Percentage for the second band | Example: 5% |
| Retention Band 2 | Dollar value limit for band 2 | Example: $1,000,000 |
| Retention Percent 3 | Percentage for the third band | Example: 1.75% |
| Retention Band 3 | Leave blank if no upper limit | — |
| Retention on Lines | Tick if retention is calculated per line item | — |
Project & Measurement Fields
| Field | Description | Example / Notes |
|---|---|---|
| Architect Project No | Enter the architect’s project reference. | — |
| Job Square Feet | Enter the job size. | Note: Confirm whether your organisation uses square metres |
Tax & Compliance Fields
| Field | Description | Example / Notes |
|---|---|---|
| AP Tax Code | Select the AP tax code. | — |
| Certified Payroll | Tick if certified payroll applies. | — |
| Tax Entity Code | Select the tax entity code. | — |
Completion & Defects Liability
| Field | Description | Example / Notes |
|---|---|---|
| Practical Completion Date | Enter the practical completion date. | — |
| Defect Liability Date | Enter the defect liability end date. | — |
| Defect Liability Months | Enter the number of months in the defect liability period. | — |
Retention Release Dates
| Field | Description | Example / Notes |
|---|---|---|
| First Retention Release Date | Enter the first release date. | — |
| Final Retention Release Date | Enter the final release date. | — |
Bank Account Compliance
| Field | Description | Example / Notes |
|---|---|---|
| PBA Applies | Tick if a Project Bank Account applies. | — |
| Project Bank Account Code | Select the PBA code. | — |
| RBA Applies | Tick if a Retention Bank Account applies. | — |
| Retention Bank Account Code | Select the RBA code. | — |
3. Add Description and Notes
Use the Description and Notes fields to provide narrative context.
- Description: Enter a high‑level summary of the job’s scope.
- Internal Notes: Add internal commentary, instructions, or background information.
Note: These fields help downstream teams understand the job’s purpose and context.
FAQ
- Do I need to complete every field in Additional Details? No. Only fields marked with a red (!) icon is mandatory.
- What happens if I select the wrong Job Type? Job Type controls defaults such as retention and cost code templates. Update it before entering cost codes or orders.
- Why is Date Completed important? It drives WIP reporting, retention release timing, and job closure workflows.
Related articles
- How to Add Job Addresses and Contacts
- How to Set Up Client/Subcontractor Orders and Choose the Correct Order Structure
- How to Set Up Resource, Operation, and Variation‑Only Cost Codes
- How to Import or Copy Cost Codes into a Job
- How to Configure Labour Rates and Cost-Plus Uplift
Next steps
If you encounter any issues while entering job details:
- Contact our Support team at support@profitz.com.